MettaCycle and F1R3FLY node deployment
Key Points
- We want to deploy F1R3FLY node via NuNet for the future integration with the MettaCycle component of the ASI node;
- ASI node design is an ongoing process, tracked by this milestone;
- The idea to deploy F1R3FLY node emerged in the conversation between Greg Lucius Meredith, @vyzo and @kabir during Hyperon-agi-meetup December 2024;
- Persistent storage is important feature that is needed for the F1R3FLY and MettaCycle node deployment now and in the future;
Work Package Deliverables
No | Deliverable | Proof |
---|---|---|
1 | Convert Kubernetes job description provided by Greg into NuNet ensemble and deploy | Demo |
2 | Design and implement a POC for deploying MettaCycle nodes via NuNet | POC and Demo |
3 | Identify additional features needed for full process of production level deployment of MettaCycle nodes within ASI node and integration with NuNet (including OCaps security, etc) | Demo and Delivery |
Timeline
As per ASI Zero Roadmap, the launch of MettaCycle Alpha Release is scheduled for Q3 2025, while during Q2, it will involve cost accounting, package manager, frontends, etc. We should deliver deliverables 1 and 2 during Q2 so that to be able to identify and coordinate integration for the Alpha release.