Closed
Milestone Jun 7, 2021–Jun 18, 2021

Marketplace Sprint 8

Focus Areas

Push to Prod

Push will be June 16th. Next sprint push to prod will include:

  1. The beginning of the SOW tools which are access controlled. (Need posting of the attachments) - Done!
  2. SSR for Scrud component. - Done!
  3. More polish - fixing bugs - Done!
  4. Alpha chatbot??

Foundations for Management Tools

Finalize endpoints and first UIs for creating SOW and enabling ability to upload and view reports.

Front End Test cases in CI/CD

Have front end test cases in CI/CD for openteams-nuxt

Support Chatbot Prototype

Test routing in staging. Push to production if infrastructure is set up and testing goes well

Polish Marketplace Pages

Push refinements

SOW Progress reports

Need back end and front end to support progress reports.

Testing

Continue to close gaps in testing, and create materials to train the team. Ensure REST APIs are tested as well.

Adopt SSR Form Gen

A change needs to be made to make caching configurable. This should be completed this sprint.

Documentation updates

We need more and more up-to-date documentation in our projects.

Schedule Changes

Jen is out on the 11th and in the afternoon on the 16th

Retrospective

The goal is to provide a summary of things that went well, didn't go well, and things to improve upon.

What went well

  • Pushed to Prod! with scope and in sprint timeframe - Maryam and Jacob
  • Architecture meetings teach a lot! - Maryam
  • David is teaching on the environment - Maryam
  • Learned a lot about caching and RBAC - Kevin
  • Pushed SOW tools to staging - Kevin and Chris
  • Status report was able to go quickly - Chris
  • Was able to adjust to API changes quickly - Favour
  • Was able to think longer term for chatbot for scaling - Favour
  • Able to attend product meeting helps with seeing where we are heading, what are deadlines, etc. - Igor
  • Documented steps about push to prod and it went smoothly - David

What didn't go well

  • Challenges with SSR on staging - Maryam
  • Bugs on some concepts that people didn't understand - Kevin and Chris and David
  • Had small things when pushed to Prod. Would have more time to polish if push to staging/prod is earlier
  • Production deploy required significant late fix and took more resources than it should.

What to try next sprint

  • Capture things earlier in the sprint rather on later in the sprint. - Maryam
  • New Methods for testing - Chris
  • Next sprint push to staging to Monday and prod Weds if possible - Jacob and Igor
  • Document how we define rest APIs using Swagger or OpenAPI (https://gitlab.com/openteams/openteams-backend/-/tree/sow-http-schema/openteams/apps/sow/http-schema) - David
  • Work items 6
  • Merge requests 2
  • Participants 2
  • Labels 1
Loading
Loading
Loading
Loading
100% complete
100%
Start date
Jun 7, 2021
Jun 7
-
Jun 18 2021
Due date
Jun 18, 2021 (Past due)
6
Work items 6
Open: 0 Closed: 6
8
Merge requests 8
Open: 0 Closed: 0 Merged: 8
0
Releases
None
Reference: openteams%"Marketplace Sprint 8"