Release 11.7
First steps
Stable branch should be created after the 7th. The 7th is the last date to reliably get things in.
-
Assign this issue to all the release managers and trainees -
Create a new slack channel #f_release_11_7
-
Set the channel topic to RMs: https://about.gitlab.com/release-managers
-
Invite all current release managers -
Inside the old release slack channel, notify about #f_release_11_7
Hello :wave: We are starting 11.7 into #f_release_11_7 Please archive this channel and join #f_release_11_7 if interested
-
Create the ~"Pick into 11.7" group label if it doesn't exist: https://gitlab.com/groups/gitlab-org/labels/new - Title:
Pick into 11.7
- Description:
Merge requests to cherry-pick into the `11-7-stable` branch.
- Color:
#00c8ca
- Title:
-
Make sure the latest CE to EE on master
branches is merged (it will reduce conflicts in the future). Ask in#ce-to-ee
when in doubt. -
Create branch 11-7-stable
from CEmaster
manually -
Create branch 11-7-stable-ee
from EEmaster
manually -
In Omnibus create both 11-7-stable
and11-7-stable-ee
frommaster
manually -
Merge GitLab CE into EE on stable branches following the Merging a CE stable branch into its EE counterpart guide -
Sync stable branches for CE, EE, and Omnibus to dev
-
Sync master branches to dev
, as the CHANGELOG will be automatically updated on master during tagging -
If needed, sync tags for dependencies ( gitlab-shell
,gitlab-workhorse
,gitlab-pages
,gitaly
) todev
(when applicable. Builds should fail if this is needed.)
RC1
- Follow the Creating RC1 guide:
-
Create an MR on CE master updating the "Installation from Source" guide, creating the "Update" guides -
Create an MR on EE master creating the "CE to EE" guides -
Ensure the above MRs are merged and marked ~"Pick into 11.7" -
Create a task list for RC1: # In Slack: /chatops run release_issue 11.7.0-rc1
-
Link the RC1 issue as a related issue in this issue
-
Subsequent RCs
-
Update the blog post upgrade barometer
section with the migration types for this release, including the time they took to complete. -
Create additional release candidates as needed:
# In Slack (update RC number): /chatops run release_issue 11.7.0-rc2
-
Link any subsequent RCs issues as a related issue in this issue
Keep in mind that:
- After the feature freeze only regression, security, and documentation fixes should be cherry-picked into stable branches.
- The final RC should point to the same commit as the final release.
On the first working day after the 7th
-
Follow the Feature freeze RC guide
22nd: release day
No new code can be added to the release that was not included in the final RC.
-
At 08:00 UTC, final release is ready for tagging (Including changes at this stage requires signoff from the VP of Engineering):
-
Ensure tests are green on CE stable branch -
Ensure tests are green on EE stable branch -
Ensure tests are green on Omnibus CE stable branch -
Ensure tests are green on Omnibus EE stable branch -
Sync stable branches for CE, EE, and Omnibus to dev
-
Sync master branches to dev
, as the CHANGELOG will be automatically updated on master during tagging
-
-
Before 10:00 UTC:
-
Tag the 11.7.0
version using therelease
command:# In Slack: /chatops run tag 11.7.0
-
Check progress of EE packages build and CE packages build
-
-
Before 12:00 UTC:
-
Notify #production channel about staging deploy. No need to require confirmation. -
On video call, deploy 11.7.0
to staging.gitlab.com# In Slack: /chatops run deploy 11.7.0-ee.0
-
Notify #production channel about canary deploy. No need to require confirmation. -
On video call, deploy 11.7.0
to the canary VMs on gitlab.com# In Slack: /chatops run deploy 11.7.0-ee.0 --production --canary
-
Confirm that there are no errors on canary -
Get confirmation from a production team member to deploy production. Use /chatops run oncall production
if needed to find who's on call. If someone besides the oncall confirms,@mention
the oncall so they are aware. -
Confirm there are no critical alerts on gitlab.com on the alerting dashboard -
On video call, deploy 11.7.0
to GitLab.com# In Slack: /chatops run deploy 11.7.0-ee.0 --production
-
-
At 13:30 UTC:
-
Publish the packages via ChatOps: # In Slack: /chatops run publish 11.7.0
- Make sure that neither packages nor the blog post get published earlier than planned without approval by the messaging lead of the release post. Mind that you don't need their approval if you're on time
- If anything goes wrong and the release is delayed, ping the release post manager on Slack to make them aware of the issue. Cross-post the slack message to the #marketing channel to notify them too
-
-
At 14:10 UTC:
-
Verify that packages appear on packages.gitlab.com
: EE / CE -
Verify that Docker images appear on hub.docker.com
: EE / CE -
Create the 11.7.0
version on version.gitlab.com -
Once all packages are available publicly and GitLab.com is up and running on the release version, ping the release post manager on Slack (#release-post channel) to give them a go to merge the release post at ~14:20 UTC, so that it will be live at 15:00 UTC -
Make sure the release post manager will tweet about the 11.7.0
release. If they don't respond, ensure someone else tweets from the#releases
channel
-