Skip to content

Update Redis Multi-Node config in RA docs

Grant Young requested to merge gy-update-mn-redis-conf-ra-docs into master

What does this MR do?

MR adjust the Redis configuration examples in the Reference Architecture docs when using multi-node.

Recently it was found some components expect to see the default Redis settings instead of specific queues. As Redis data continues to expand the recommended approach now is to set the default for most data and only set queues for specific data. This MR reflects that.

Related issues

Relates omnibus-gitlab#7419

Author's checklist

If you are a GitLab team member and only adding documentation, do not add any of the following labels:

  • ~"frontend"
  • ~"backend"
  • ~"type::bug"
  • ~"database"

These labels cause the MR to be added to code verification QA issues.

Reviewer's checklist

Documentation-related MRs should be reviewed by a Technical Writer for a non-blocking review, based on Documentation Guidelines and the Style Guide.

If you aren't sure which tech writer to ask, use roulette or ask in the #docs Slack channel.

  • If the content requires it, ensure the information is reviewed by a subject matter expert.
  • Technical writer review items:
    • Ensure docs metadata is present and up-to-date.
    • Ensure the appropriate labels are added to this MR.
    • Ensure a release milestone is set.
    • If relevant to this MR, ensure content topic type principles are in use, including:
      • The headings should be something you'd do a Google search for. Instead of Default behavior, say something like Default behavior when you close an issue.
      • The headings (other than the page title) should be active. Instead of Configuring GDK, say something like Configure GDK.
      • Any task steps should be written as a numbered list.
      • If the content still needs to be edited for topic types, you can create a follow-up issue with the docs-technical-debt label.
  • Review by assigned maintainer, who can always request/require the reviews above. Maintainer's review can occur before or after a technical writer review.

Merge request reports