Job timeout risk: spec/features/projects/project_overview_spec.rb ran much longer than expected
Why was this issue created?
spec/features/projects/project_overview_spec.rb was reported to have:
- exceeded Knapsack's expected runtime by at least 50%, and
- been identified as a notable pipeline bottleneck and a job timeout risk
Suggested steps for investigation
- To reproduce in CI by running test files in the same order, you can follow the steps listed here.
- Identify if a specific test case is stalling the run time. Hint: You can search the job's log for
Starting example group spec/features/projects/project_overview_spec.rband view the elapsed time after each test case in the proceeding lines starting with[RSpecRunTime]. - If the test file is large, consider refactoring it into multiple files to allow better test parallelization across runners.
- If the run time cannot be fixed in time, consider quarantine the spec(s) to restore performance.
Run time details
- Reported from pipeline 5046765 created at
2026-01-06T16:46:49Z
| Field | Value |
|---|---|
| Job URL | rspec-system-pg16-project-studio-enabled-9-32 |
| Job total RSpec suite run time | expected: 26 minutes 37.63 seconds, actual: 80 minutes 44.21 seconds
|
| Spec file run time | expected: 12.85 seconds, actual: 24 minutes 2.37 seconds
|
| Spec file weight |
29.78% of total suite run time |