[Feature flag] Cleanup geo_project_repository_replication_v2
Everyone can contribute. Help move this issue forward while earning points, leveling up and collecting rewards.
Summary
This issue is to cleanup the geo_project_repository_replication feature flag, after the feature flag has been enabled by default for an appropriate amount of time in production - we would want the FF around for 2 or 3 milestones, since the users of Geo, usually don't upgrade every milestone. Keeping it around longer, will give us a better chance to see it in production.
Once this FF is removed, we can no longer toggle between projects and project_repositories tables for Geo replication and verification.
This FF was introduced in !194051 (closed)
As part of this cleanup, we need the following:
-
Remove project_id column from project_repository_registry (closed MR here -
Remove the code that depends on this FF -
Remove the enumeration of projects entirely, for Geo replication and verification -
Update documentation added in Geo: Document the 2 versions of project repo re... (#550191) and Geo: Document the difference in number of proje... (#547895)
Owners
- Team: Geo
- Most appropriate slack channel to reach out to:
#g_geo - Best individual to reach out to: Aakriti (@aakriti.gupta )
- PM: @sranasinghe
Stakeholders
Expectations
What might happen if this goes wrong?
Cleaning up the feature flag
-
Specify in the issue description if this feature will be removed completely or will be productized as part of the Feature Flag cleanup -
Create a merge request to remove <feature-flag-name>feature flag. Ask for review and merge it.-
Remove all references to the feature flag from the codebase. -
Remove the YAML definitions for the feature from the repository. -
Create a changelog entry.
-
-
Ensure that the cleanup MR has been deployed to both production and canary. If the merge request was deployed before the code cutoff, the feature can be officially announced in a release blog post. -
/chatops run auto_deploy status <merge-commit-of-cleanup-mr>
-
-
Close the feature issue to indicate the feature will be released in the current milestone. -
If not already done, clean up the feature flag from all environments by running these chatops command in #productionchannel:/chatops run feature delete <feature-flag-name> --dev --pre --staging --staging-ref --production -
Close this rollout issue.
Edited by 🤖 GitLab Bot 🤖