Organise Checkpoint meeting with Infrastructure

Problem to solve

The infrastructure team has already worked on enabling Geo .com. We are taking over driving this project but before we start, we need to collect all relevant information and capture it to avoid duplicating effort.

Further details

Infra kept their tickets in gitlab-com/gl-infra&12 (closed)

Proposal

  • Organise meeting with Infra and collect all relevant information
  • Document the initial Geo DR plan from infrastructure
  • Document the steps taken in this issue
  • Establish point of contact in Infra

Links / references

Edited Sep 23, 2019 by Fabian Zimmer
Assignee Loading
Time tracking Loading