Multi-Project Pipeline Graph collapses stages if a downstream is present

Summary

When creating multi-project pipeline graphs, it seems that the addition of a downstream project collapses the stages of the actual project.

Steps to reproduce

Create a pipeline for a project that is triggering a downstream.

Example Project

https://gitlab.com/bikebilly/multi-project-pipeline-1/pipelines/9225773

What is the current bug behavior?

Stages for the current project are drawn with incorrect spacing between them

What is the expected correct behavior?

Stages are separated correctly.

Relevant logs and/or screenshots

Everything is file if there is no downstream project in the graph: before

As soon as the downstream item appears, current stages are collapsed: after

Assignee Loading
Time tracking Loading