Jira dynamic-links do not refresh after updating the Jira-integration URL
Summary
Jira dynamic-links do not refresh after updating the Jira-integration URL
Steps to reproduce
- Set Jira-Integraion at the project-level
- Confirm both the JIRA-link and the Jira-dynamic-urls point at the desired URL.
- Change Jira-Integraion at the project-level to point somewhere else
Example Project
What is the current bug behavior?
Now, the JIRA-link points at the correct (new) server but Jira-dynamic-links still point at the old URL.
What is the expected correct behavior?
Both the JIRA-link and the Jira-dynamic-links should points at the correct (new) server.