PARTIAL SUCCESS: Upgrade Geo HA installation from 12.8.1 to the latest 12.9 package
Versions
Current: 12.8.1
Target: 12.9.10
Upgrade checklist
Preflight - upgrade
- Create a zoom meeting and schedule a recorded meeting (make sure you have a paid account, otherwise recordings will stop after 40 minutes)
- Check if the Geo HA update instructions contain version specific changes
- Check if PostgreSQL is already the latest shipped version. If not, ensure PostgreSQL upgrade instructions are followed.
- Check if any upgrade warnings exist
- Verify that the Geo cluster is healthy pre upgrade
- Find the latest packaged version of GitLab that can be used for zero downtime upgrades
- Set up the looping test pipeline to run during the upgrade procedure. Prepare to run a new pipeline at the beginning of each upgrade step.
Upgrade
- Retrieve a beverage of choice within a drinkable temperature range
- Join Zoom meeting and wait for arrival. Hit the record button
- Manually trigger the looping test pipeline to start running smoke tests at the beginning of each major upgrade step (choose deploy node, update primary, update secondary, run migrations)
- Perform upgrade steps described in latest documentation.
- During the upgrade process, monitor the looping test pipeline for any failures
- Record any issues encountered during the upgrade
- Verify cluster health post upgrade
- Verify PostgreSQL version is correct
Postflight
- Record the upgrade outcome as SUCCESS (upgrade with zero downtime), FAILED, PARTIAL SUCCESS (upgrade but with downtime or unconfirmed downtime)
- Open new issues and inform @nhxnguyen and @fzimmer to confirm next steps
- Create new issue for the next upgrade demo (the next versions) and assign to @nhxnguyen and @fzimmer
Edited by Jennifer Louie