Pipeline icons is not always correctly updated on pipeline overview

gitlab-ce@9.5.0

The icon in the Pipelines pages is not always updated in real-time for the stages, even if the page is refreshed the icon is still wrong.

When hovering, each stage the icon is correct.

Screen_Shot_2017-08-28_at_11.22.32

Screen_Shot_2017-08-28_at_11.22.24

Assignee Loading
Time tracking Loading