2019-09-09 - Triage report for "group::geo"
Hi, @fzimmer @rnienaber @andr3
This is a group or stage level triage package that aims to summarize the feature proposals and bugs which have not been scheduled or triaged. For more information please refer to the handbook:
Scheduling the workload is a collaborative effort by the Product Managers and Engineering Managers for that group. Please work together to provide a best estimate on priority and milestone assignments. For each issue please:
- Determine if the issue should be closed if it is no longer relevant or a duplicate.
- If it is still relevant please assign either a best estimate versioned milestone, the %Backlog or the %Awaiting further demand milestone.
- Specifically for ~bug, if there is no priority or clarity on a versioned milestone, please add a Priority label. Priority labels have an estimate SLO attached to them and help team members and the wider community understand roughly when it will be considered to be scheduled.
- Once a milestone has been assigned please check off the box for that issue.
- Please work with your team to complete the list by the due date set.
Unscheduled feature (non-customer)
-
#14812 (closed) Geo: Avoid hiccups while refreshing foreign schema Geo Administration, feature, groupgeo -
#14785 (closed) Remove "How to work faster with Geo" clone instructions modal feature, groupgeo -
#14774 (closed) Geo: Add setting to adjust replication lag threshold ~"Geo : Replication Lag Warning", devopsenablement, feature, groupgeo -
#14773 (closed) Geo: Incorporate event processing lag in all replication lag measurements that users see ~"Geo : Replication Lag Warning", devopsenablement, feature, groupgeo -
#14631 (closed) Add secondary lag message on Git push over SSH ~"Geo : Replication Lag Warning", devopsenablement, feature, geoplanning, groupgeo, workflowsolution validation -
#13720 Restrictive selective synchronisation feature, geoplanning, groupgeo, ~"product discovery", workflowproblem validation -
#13029 Selective sync for replicated Docker registries ~"Geo [DEPRECATED]", ~"GitLab Enterprise Edition", customer+, devopsenablement, feature, geoplanning, groupgeo, workflowplanning breakdown
Bug Section
For the following bugs. Please either close or assign either a versioned milestone, the %Backlog or the %Awaiting further demand milestone and ensure that a priority label is set.
Heatmap for all bugs
Bugs for their priority and severity label are counted here. Every bug should have severity and priority labels applied. Please take a look at the bugs which fall into the columns indicating that the priority or severity labels are currently missing.
| ~S1 | ~S2 | ~S3 | ~S4 | ~"No severity" | |
|---|---|---|---|---|---|
| ~P1 | 0 | 0 | 0 | 0 | 0 |
| ~P2 | 0 | 1 | 0 | 0 | 0 |
| ~P3 | 0 | 0 | 15 | 4 | 0 |
| ~P4 | 0 | 0 | 2 | 7 | 0 |
| ~"No priority" | 0 | 0 | 0 | 0 | 2 |
Unscheduled ~bug (non-customer)
-
#14794 (closed) rake gitlab:geo:check does not give the actual state Geo Administration, ~"GitLab Enterprise Edition", ~"bug", devopsenablement, geoplanning, groupgeo -
#4897 (closed) Geo: High rate of "Cannot obtain an exclusive lease" messages ~"Geo Replication/Sync", ~"Geo [DEPRECATED]", ~"GitLab Enterprise Edition", ~"P4", ~"S4", ~"bug", devopsenablement, groupgeo, ~"technical debt", workflowscheduling -
#4778 (closed) Etags invalidation on the Geo secondary ~"Accepting merge requests", Category:Continuous Integration, ~"Geo Verification/Accuracy", ~"Geo [DEPRECATED]", ~"GitLab Enterprise Edition", ~"P4", ~"S4", ~"Verify [DEPRECATED]", ~"bug", devopsenablement, groupgeo, workflowscheduling -
#4748 (closed) Error 500 when browsing artifacts on Geo secondary ~"Accepting merge requests", Category:Continuous Integration, ~"Geo Replication/Sync", ~"Geo [DEPRECATED]", ~"GitLab Enterprise Edition", ~"P3", ~"S3", ~"Verify [DEPRECATED]", ~"artifacts", ~"bug", default-priority, default-severity, devopsenablement, groupgeo -
#4549 (closed) Handle upload/LFS object/artifact delete failures properly -- Follow-up from "Add Geo support for CI job artifacts" ~"Geo Replication/Sync", ~"Geo [DEPRECATED]", ~"GitLab Enterprise Edition", ~"P3", ~"S3", ~"bug", devopsenablement, groupgeo, workflowblocked -
#4127 (closed) Disabling Geo nodes does not work as expected ~"Accepting merge requests", Geo Administration, ~"Geo [DEPRECATED]", ~"GitLab Enterprise Edition", ~"P3", ~"S3", ~"bug", default-priority, default-severity, devopsenablement, groupgeo -
#3651 (closed) Projects deleted on the primary may not be deleted on the secondary due to sidekiq losing jobs ~"Accepting merge requests", ~"Geo Verification/Accuracy", ~"Geo [DEPRECATED]", ~"GitLab Enterprise Edition", ~"P3", ~"S3", ~"bug", default-priority, default-severity, devopsenablement, groupgeo, ~"technical debt"
This is a group level triage package that aims to collate the latest bug reports (for frontend and otherwise) and feature proposals. For more information please refer to the handbook: