What is the selective sync behaviour when project not available on secondary node?

Given a primary node and a secondary node, when selective sync is enabled but a project from the primary was not synced to the secondary what happens when a user tries to pull the missing project from the secondary? Is the use redirected to the primary?

Assignee Loading
Time tracking Loading