Skip to content

Resolve "Geo DR: planned failover (including of a multi-node secondary)"

Nick Thomas requested to merge (removed):3952-planned-failover-docs into master

What does this MR do?

Are there points in the code the reviewer needs to double check?

Why was this MR needed?

Screenshots (if relevant)

Does this MR meet the acceptance criteria?

What are the relevant issue numbers?

Closes #3952 (closed)

Edited by Nick Thomas

Merge request reports