Gitaly-on-NFS staging test plan
How will we test this on staging with 9.1. RCx.
-
make sure Gitaly over TCP works in omnibus -
test with localhost -
test with remote host and different repository root -
instructions to prepare staging -
wait for package with all required capabilities to be deployed on staging -
schedule time with someone with production access to run experiments on staging
Parallel production issue: https://gitlab.com/gitlab-com/infrastructure/issues/1777
Merge Request with (some of) the required staging configuration changes https://dev.gitlab.org/cookbooks/chef-repo/merge_requests/637