Gitaly FY23-Q2 OKR planning
&7461 (closed))
Improved data safety (- Consistency verification MVP landed
- Atomic rename, creation and deletion operations
- Incremental backups are fully useable past MVP
- Fix cases which cause Gitaly to create replication jobs &7741 (closed)
gitlab-com/gl-infra&640 (closed)
Gitaly Cluster ready for dogfooding- Design admin tools for Gitaly &7896 (closed)
- Cluster fits into production infrastructure gitlab-com/gl-infra/scalability#1671
- Plan prepared for Cluster dogfooding
Team
- Ramp up new engineers
Meta
- Detailed plan and LOE cost analysis for FIPS compliance
ALSO CONSIDERED
&7440 (closed))
Improve stability for large repositories (- [blocked] Repository maintenance cleanup (remove old callsites and code) -- blocked until %15.2.
- [not for Gitaly team] Define current scaling limits (https://gitlab.com/gitlab-org/quality/performance/-/wikis/home)
- [not for Gitaly team] Create test framework for preventing regressions against established scaling limits
- [not urgent enough] Allow Gitaly to push back on traffic surges &7891 (closed)
Edited by Andras Horvath