Allow options to add iteration cadence, epic, and due date options to glab issue create

Describe the feature or problem you'd like to solve The glab issue create command, while great, could be even better if it had options for iteration, epic, and due date. Right now, created stories still need manual updates to set these options.

Propose a Solution Add additional options to address the aforementioned.

-i, --iteration-cadence string     The global ID or title of an iteration cadence to assign (auto-assigns open iteration)
-e, --epic string          The global ID or title of an epic to assign
-d, --due-date string      A date in 'YYYY-MM-DD' format

e.g. glab issue create --epic 1 --iteration-cadence 123 --due-date '2022-09-06' ...

Additional context N/A

Assignee Loading
Time tracking Loading