simplify support regression escalation description

4 jobs from lm-clarify-support-regression-process in 16 minutes and 41 seconds (queued for 78 minutes and 55 seconds)
latest
Status Job ID Name Coverage
  Build
passed #13737601
gitlab-org
build_branch

00:11:44

failed #13737584
gitlab-org
lint

00:04:57

 
  Deploy
skipped #13737610
deploy review-apps allowed to fail
review
skipped #13737632
deploy review-apps allowed to fail manual
review_stop
 
Name Stage Failure
failed
lint Build There is an unknown failure, please try again
Running with gitlab-ci-multi-runner 9.0.1 (a3da309)
on docker-auto-scale (1d6b581d)
ERROR: Preparation failed: Can't connect
Will be retried in 3s ...
ERROR: Preparation failed: Can't connect
Will be retried in 3s ...
ERROR: Preparation failed: Can't connect
Will be retried in 3s ...
ERROR: Job failed (system failure): Can't connect