Skip to content

Release post - GitLab 10.2

Fabio Busatto requested to merge release-10-2 into master

Review Apps link: https://release-10-2.about.gitlab.com/2017/11/22/gitlab-10-2-released/

Intro link: https://gitlab.com/gitlab-com/www-gitlab-com/blob/release-10-2/source/posts/2017-11-22-gitlab-10-2-released.html.md
Items link: https://gitlab.com/gitlab-com/www-gitlab-com/blob/release-10-2/data/release_posts/2017_11_22_gitlab_10_2_released.yml
Images link: https://gitlab.com/gitlab-com/www-gitlab-com/tree/release-10-2/source/images/10_2

Features YAML link: https://gitlab.com/gitlab-com/www-gitlab-com/blob/release-10-2/data/features.yml

Release post 🚀

General Contributions

General contributions from the team.

Due date: 11/14 (6th working day before the 22nd)

  • Label MR: ~"blog post" release
  • Add milestone
  • Intro
  • MVP (feature block)
  • MVP data/mvps.yml
  • Add cover image image_title (compressed)
  • Upgrade barometer
  • Top feature
  • Performance improvements
  • Omnibus improvements
  • GitLab Runner changes
  • Deprecations
  • Documentation links
  • Add features to data/features.yml (with accompaning image)
  • Authorship (author's data)

Features

PMs: please check your box only when all your features and deprecations were added with completion (documentation links, images, etc). Pls don't check if there are still things missing.

  • Fabio
  • Victor
  • Mark P.
  • Mike
  • Joshua
  • James

Tip: make your own checklist:

  • Primary features
  • Improvements (secondary features)
  • Deprecations
  • Documentation links
  • Illustrations
  • Update features.yml

Review

Ideally, complete the review until the 4th working day before the 22nd, so that the 3rd and the 2nd working day before the release could be left for fixes and small improvements.

Content review (PMs)

Due date: 11/20 (2nd working day before the 22nd)

  • Label MR: ~"blog post" release review-in-progress
  • General review (PM)
    • Check Features' names
    • Check Features' availability (CE, EES, EEP)
    • Check Documentation links
    • Update data/promo.yml
    • Check all images' size - compress whenever > 300KB
    • Meaningful links (SEO)
    • Check links to product/feature webpages
  • Copyedit (Rebecca, Marcia, or Axil)
    • Title
    • Description
    • Grammar, spelling, clearness (body)
  • Marketing review (PMM, CMM) (William)
  • Final review (Job)

Structural Check

Due date: 11/20 (2nd working day before the 22nd)

    1. Structural check
  • Label MR: ~"blog post" release review-structure
  • Check frontmatter (entries, syntax)
  • Check image_title and twitter_image
  • Check image shadow {:.shadow}
  • Check images' ALT text
  • Videos/iframes wrapped in <figure> tags (responsiveness)
  • Add/check <!-- more --> separator
  • Add/check cover img reference (at the end of the post)
  • Columns (content balance between the columns)
  • Badges consistency (applied to all headings)
  • Remove any remaining instructions
  • Remove HTML comments
  • Run deadlink checker
  • Update release template with any changes (if necessary)
Edited by Job van der Voort

Merge request reports