Skip to content

Add friday the 20th to the schedule

Lien Van Den Steen requested to merge ceo-shadow-schedule-date-adjustment into master

Why is this change being made?

Because of travel arrangements, the 20th was originally not possible to be included for both CEO shadows, but now for at least me it is possible. So adding Friday the 20th back to the schedule.

Does this MR meet the acceptance criteria?

Assign to DRI

  • Did you assign this change to the correct DRI of the page or information you are changing?

Conformity

Edited by Emilie Schario

Merge request reports