Infra/Dev escalation execution: 2019-08
Background:
See epic &122
Instructions:
- Directors and Managers: Sign up as coordinator for the month, please assign this issue to yourself, and update the sign up sheet (link below) Coordinator column.
- Engineers: sign up slots in the spreadsheet https://docs.google.com/spreadsheets/d/10uI2GzqSvITdxC5djBo3RN34p8zFfxNASVnFlSh8faU/edit#gid=382724865.
- Engineers: cross link escalated issues to this issue.
- Coordinator: close this issue when the month wraps up.
Action items and due dates:
-
Coordinator nomination: due by 15th of previous month -
All slots are signed up: due by EOD Friday, 2019-08-09, local time
For this first iteration, the rotation starts 00:00:00 Monday, 2019-08-12 UTC.
Access to systems and tools:
- Infrastructure team, BEs, Managers, Directors populate the System Access tab
- Engineers add their names to required systems and tools
- Group AR submitted by @cdu1 daily (for the week of 2019-08-05) to grant access timely
- Individual AR after the week of 2019-08-05 (individual Engineers are responsible to create these ARs)
Edited by Chun Du