Skip to content

Pre-failover tasks for Pages

Firstly, I invite anyone to note anything I forget. The following needs to be done before a failover.

  • one more rsync moved to failover checklist: !7 (merged)
  • data verification (needs to be determined what that would entail): #388 (closed)
  • failover moved to failover checklist: !7 (merged)
  • Related: Use Azure HAProxy instances to route Pages data from old Pages IP in Azure to new Pages instance in GCP: #159 (closed)

Do note, however that the rsync does take a while, even if it has little to transfer. As such, we should determine the best way to ensure the files are in sync up after the failover.

Edited by Andrew Newdigate
To upload designs, you'll need to enable LFS and have an admin enable hashed storage. More information