Decommission old prometheus infrastructure
Post migration to Mimir we need to remove the old Prometheus instances that were responsible for data in Thanos.
When we migrated to Mimir we changed our Prometheus instances to use Prometheus in agent mode. Because of this we provisioned new instances side by side the old ones for the migration.
This includes removing the old GCE VM instances as well as GKE Prometheus instances, and the respective configurations in config-mgmt.
Instances to cleanup:
GKE:
-
gprd-gitlab-gke -
gprd-us-east1-b -
gprd-us-east1-c -
gprd-us-east1-d -
gstg-gitlab-gke -
gstg-us-east1-b -
gstg-us-east1-c -
gstg-us-east1-d -
ops-gitlab-gke -
ops-central -
pre-gitlab-gke -
prdsub -
stgsub -
db-benchmarking
GCE (Project based):
-
gitlab-production -
gitlab-staging-1 -
gitlab-ops -
gitlab-pre -
db-benchmarking
Edited by Nick Duff