2023-03-01: [blue shared runners 1,2] enable Network Per-Build feature flag

Production Change

Change Summary

Simply enables the feature flag Network Per-Build for 40% of the active shared runner managers.

Reference: Rollout Network Per-Build for Linux shared runners (&905).

Change Details

  1. Services Impacted - ServiceCI Runners
  2. Change Technician - @rehab
  3. Change Reviewer - @steveazz
  4. Time tracking - 15 minutes
  5. Downtime Component - none

Detailed steps for the change

Change Steps - steps to take to execute the change

Estimated Time to Complete (mins) - 5m

ssh runners-manager-shared-blue-[1,2].c.gitlab-ci-155816.internal
sudo ls -lrt /root/.docker/machine/machines | head
sudo -H docker-machine ssh runner-qvbvroxm-private-1677071904-c0496b72
docker network ls

# results should include a bridge similar to:
# a21752a8db68        runner-qvbvroxm-project-xxxxx-concurrent-0-job-3814347006-network   bridge              local

Rollback

Rollback steps - steps to be taken in the event of a need to rollback this change

Estimated Time to Complete (mins) - Estimated Time to Complete in Minutes

Monitoring

Key metrics to observe

  • metric:

    • Location: Thanos query.

    • What changes to this metric should prompt a rollback: Sharp decrease in gitlab_runner_jobs_total.

    • Location: Thanos query.

    • What changes to this metric should prompt a rollback: Increase in gitlab_runner_failed_jobs_total.

  • Dashboard: ci-runners:Overview

  • Dashboard: ci-runners: Incident Support: database

Change Reviewer checklist

C4 C3 C2 C1:

  • Check if the following applies:
    • The scheduled day and time of execution of the change is appropriate.
    • The change plan is technically accurate.
    • The change plan includes estimated timing values based on previous testing.
    • The change plan includes a viable rollback plan.
    • The specified metrics/monitoring dashboards provide sufficient visibility for the change.

C2 C1:

  • Check if the following applies:
    • The complexity of the plan is appropriate for the corresponding risk of the change. (i.e. the plan contains clear details).
    • The change plan includes success measures for all steps/milestones during the execution.
    • The change adequately minimizes risk within the environment/service.
    • The performance implications of executing the change are well-understood and documented.
    • The specified metrics/monitoring dashboards provide sufficient visibility for the change.
      • If not, is it possible (or necessary) to make changes to observability platforms for added visibility?
    • The change has a primary and secondary SRE with knowledge of the details available during the change window.
    • The labels blocks deployments and/or blocks feature-flags are applied as necessary

Change Technician checklist

  • Check if all items below are complete:
    • The change plan is technically accurate.
    • This Change Issue is linked to the appropriate Issue and/or Epic
    • Change has been tested in staging and results noted in a comment on this issue.
    • A dry-run has been conducted and results noted in a comment on this issue.
    • The change execution window respects the Production Change Lock periods.
    • For C1 and C2 change issues, the change event is added to the GitLab Production calendar.
    • For C1 and C2 change issues, the SRE on-call has been informed prior to change being rolled out. (In #production channel, mention @sre-oncall and this issue and await their acknowledgement.)
    • For C1 and C2 change issues, the SRE on-call provided approval with the eoc_approved label on the issue.
    • For C1 and C2 change issues, the Infrastructure Manager provided approval with the manager_approved label on the issue.
    • Release managers have been informed (If needed! Cases include DB change) prior to change being rolled out. (In #production channel, mention @release-managers and this issue and await their acknowledgment.)
    • There are currently no active incidents that are severity1 or severity2
    • If the change involves doing maintenance on a database host, an appropriate silence targeting the host(s) should be added for the duration of the change.