2022-09-23: Upgrade gitlab-logs-prod ELK to 7.17
Production Change
Change Summary
In order to benefit from ILM hot/warm automated allocation management, we need to upgrade the Elastic cluster to 7.17 (from 7.16). Upgrade procedure is handled by the SaaS product.
The gitlab-logs-nonprod and gitlab-logs-pre deployments have already been upgraded to 7.17.
Change Details
- Services Impacted - ServiceLogging
-
Change Technician -
@f_santos - Change Reviewer - @gsgl
- Time tracking - unknown
- Downtime Component - none
Detailed steps for the change
Change Steps - steps to take to execute the change
Estimated Time to Complete (mins) - 60
-
Set label changein-progress /label ~change::in-progress -
Go to https://cloud.elastic.co/deployments/92c87c26b16049b0a30af16b94105528 -
Initiate upgrade to 7.17.6 -
Wait for upgrade to complete -
Set label changecomplete /label ~change::complete
Rollback
Rollback steps - steps to be taken in the event of a need to rollback this change
Estimated Time to Complete (mins) -
-
Set label changeaborted /label ~change::aborted
Monitoring
Key metrics to observe
- Metric:
- Location: https://cloud.elastic.co/deployments/92c87c26b16049b0a30af16b94105528/metrics
- What changes to this metric should prompt a rollback: N/A
Change Reviewer checklist
-
Check if the following applies: - The scheduled day and time of execution of the change is appropriate.
- The change plan is technically accurate.
- The change plan includes estimated timing values based on previous testing.
- The change plan includes a viable rollback plan.
- The specified metrics/monitoring dashboards provide sufficient visibility for the change.
-
Check if the following applies: - The complexity of the plan is appropriate for the corresponding risk of the change. (i.e. the plan contains clear details).
- The change plan includes success measures for all steps/milestones during the execution.
- The change adequately minimizes risk within the environment/service.
- The performance implications of executing the change are well-understood and documented.
- The specified metrics/monitoring dashboards provide sufficient visibility for the change.
- If not, is it possible (or necessary) to make changes to observability platforms for added visibility?
- The change has a primary and secondary SRE with knowledge of the details available during the change window.
- The labels blocks deployments and/or blocks feature-flags are applied as necessary
Change Technician checklist
-
Check if all items below are complete: - The change plan is technically accurate.
- This Change Issue is linked to the appropriate Issue and/or Epic
- Change has been tested in staging and results noted in a comment on this issue.
- A dry-run has been conducted and results noted in a comment on this issue.
- The change execution window respects the Production Change Lock periods.
- For C1 and C2 change issues, the change event is added to the GitLab Production calendar.
- For C1 and C2 change issues, the SRE on-call has been informed prior to change being rolled out. (In #production channel, mention
@sre-oncalland this issue and await their acknowledgement.) - For C1 and C2 change issues, the SRE on-call provided approval with the eoc_approved label on the issue.
- For C1 and C2 change issues, the Infrastructure Manager provided approval with the manager_approved label on the issue.
- Release managers have been informed (If needed! Cases include DB change) prior to change being rolled out. (In #production channel, mention
@release-managersand this issue and await their acknowledgment.) - There are currently no active incidents that are severity1 or severity2
- If the change involves doing maintenance on a database host, an appropriate silence targeting the host(s) should be added for the duration of the change.
Edited by Gonzalo Servat