2022-03-15: Disable api-gke-us-east1-d on gstg

Production Change

Change Summary

Part of the onboarding issue for on-call https://gitlab.com/gitlab-com/gl-infra/reliability/-/issues/14842 we should disable a backend in staging to learn how to do it.

Change Details

  1. Services Impacted - ServiceAPI
  2. Change Technician - @steveazz
  3. Change Reviewer - @igorwwwwwwwwwwwwwwwwwwww
  4. Time tracking - 10 minutes
  5. Downtime Component - none

Detailed steps for the change

Pre-Change Steps - steps to be completed before execution of the change

Estimated Time to Complete (mins) - Estimated Time to Complete in Minutes

Change Steps - steps to take to execute the change

Estimated Time to Complete (mins) - 10

  • Disable api-gke-us-east1-d
    cd chef-repo
    ./bin/set-server-state gstg drain api-gke-us-east1-d
  • Check that the server is in drain
    ./bin/get-server-state gstg | rg 'api-gke-us-east1-d'
  • Enable api-gke-us-east1-d
    cd chef-repo
    ./bin/set-server-state gstg ready api-gke-us-east1-d

Post-Change Steps - steps to take to verify the change

Estimated Time to Complete (mins) - Estimated Time to Complete in Minutes

  • Check that the server is in UP
    ./bin/get-server-state gstg | rg 'api-gke-us-east1-d'

Rollback

Rollback steps - steps to be taken in the event of a need to rollback this change

Estimated Time to Complete (mins) - Estimated Time to Complete in Minutes

  • Enable api-gke-us-east1-d
    cd chef-repo
    ./bin/set-server-state gstg ready api-gke-us-east1-d

Monitoring

Key metrics to observe

  • Metric: Metric Name
    • Location: Dashboard URL
    • What changes to this metric should prompt a rollback: Describe Changes

Summary of infrastructure changes

  • Does this change introduce new compute instances?
  • Does this change re-size any existing compute instances?
  • Does this change introduce any additional usage of tooling like Elastic Search, CDNs, Cloudflare, etc?

Summary of the above

Change Reviewer checklist

C4 C3 C2 C1:

  • The scheduled day and time of execution of the change is appropriate.
  • The change plan is technically accurate.
  • The change plan includes estimated timing values based on previous testing.
  • The change plan includes a viable rollback plan.
  • The specified metrics/monitoring dashboards provide sufficient visibility for the change.

C2 C1:

  • The complexity of the plan is appropriate for the corresponding risk of the change. (i.e. the plan contains clear details).
  • The change plan includes success measures for all steps/milestones during the execution.
  • The change adequately minimizes risk within the environment/service.
  • The performance implications of executing the change are well-understood and documented.
  • The specified metrics/monitoring dashboards provide sufficient visibility for the change. - If not, is it possible (or necessary) to make changes to observability platforms for added visibility?
  • The change has a primary and secondary SRE with knowledge of the details available during the change window.

Change Technician checklist

  • This issue has a criticality label (e.g. C1, C2, C3, C4) and a change-type label (e.g. changeunscheduled, changescheduled) based on the Change Management Criticalities.
  • This issue has the change technician as the assignee.
  • Pre-Change, Change, Post-Change, and Rollback steps and have been filled out and reviewed.
  • This Change Issue is linked to the appropriate Issue and/or Epic
  • Necessary approvals have been completed based on the Change Management Workflow.
  • Change has been tested in staging and results noted in a comment on this issue.
  • A dry-run has been conducted and results noted in a comment on this issue.
  • SRE on-call has been informed prior to change being rolled out. (In #production channel, mention @sre-oncall and this issue and await their acknowledgement.)
  • Release managers have been informed (If needed! Cases include DB change) prior to change being rolled out. (In #production channel, mention @release-managers and this issue and await their acknowledgment.)
  • There are currently no active incidents.
Edited by Steve Xuereb