2023-09-29: shut down sentry.gitlab.net
Production Change
Change Summary
This CR will carry out the changes needed to finally decommission sentry.gitlab.net
in favour of new-sentry.gitlab.net
. See https://gitlab.com/gitlab-com/gl-infra/reliability/-/issues/23710
Change Details
- Services Impacted - ServiceSentry
-
Change Technician -
@ayeung
- Change Reviewer - @nduff
- Time tracking - 45m
- Downtime Component - none
Detailed steps for the change
Change Steps - steps to take to execute the change
Estimated Time to Complete (mins) - 30mins
-
Set label changein-progress /label ~change::in-progress
-
Disable the enable_old_sentry_integration
feature flag so events stop getting sent to the old instance:/chatops run feature set enable_old_sentry_integration false --staging --production
-
Shut down VM via gcloud
CLI-
Ensure gcloud
is using thegitlab-ops
project:gcloud config set project gitlab-ops
-
Stop the VM gcloud compute instances stop sentry-01-sv-ops
-
-
Merge MR to point sentry.gitlab.net
tonew-sentry.gitlab.net
via a CNAME DNS entry -
Set label changecomplete /label ~change::complete
Rollback
Rollback steps - steps to be taken in the event of a need to rollback this change
Estimated Time to Complete (mins) - N/A
Since we don't need/want this machine anymore, there will be no rollback.
Monitoring
Key metrics to observe
N/A
Change Reviewer checklist
-
Check if the following applies: - The scheduled day and time of execution of the change is appropriate.
- The change plan is technically accurate.
- The change plan includes estimated timing values based on previous testing.
- The change plan includes a viable rollback plan.
- The specified metrics/monitoring dashboards provide sufficient visibility for the change.
-
Check if the following applies: - The complexity of the plan is appropriate for the corresponding risk of the change. (i.e. the plan contains clear details).
- The change plan includes success measures for all steps/milestones during the execution.
- The change adequately minimizes risk within the environment/service.
- The performance implications of executing the change are well-understood and documented.
- The specified metrics/monitoring dashboards provide sufficient visibility for the change.
- If not, is it possible (or necessary) to make changes to observability platforms for added visibility?
- The change has a primary and secondary SRE with knowledge of the details available during the change window.
- The change window has been agreed with Release Managers in advance of the change. If the change is planned for APAC hours, this issue has an agreed pre-change approval.
- The labels blocks deployments and/or blocks feature-flags are applied as necessary.
Change Technician checklist
-
Check if all items below are complete: - The change plan is technically accurate.
- This Change Issue is linked to the appropriate Issue and/or Epic
- Change has been tested in staging and results noted in a comment on this issue.
- A dry-run has been conducted and results noted in a comment on this issue.
- The change execution window respects the Production Change Lock periods.
- For C1 and C2 change issues, the change event is added to the GitLab Production calendar.
- For C1 and C2 change issues, the SRE on-call has been informed prior to change being rolled out. (In #production channel, mention
@sre-oncall
and this issue and await their acknowledgement.) - For C1 and C2 change issues, the SRE on-call provided approval with the eoc_approved label on the issue.
- For C1 and C2 change issues, the Infrastructure Manager provided approval with the manager_approved label on the issue.
- Release managers have been informed prior to any C1, C2, or blocks deployments change being rolled out. (In #production channel, mention
@release-managers
and this issue and await their acknowledgment.) - There are currently no active incidents that are severity1 or severity2
- If the change involves doing maintenance on a database host, an appropriate silence targeting the host(s) should be added for the duration of the change.
Edited by Adeline Yeung