Prioritized labels
Drag to reorder prioritized labels and change their relative priority.
Other labels
Back End Architecture
aruw / controls
design changes to scheduling or other mid-level architecture, restructuring code
Controls
aruw / controls
control systems - designing subsystem/command interfaces and control systems
Embedded Systems
aruw / controls
raw embedded systems stuff, interacting with hardware directly and not through already designed layers
EpicOdometry and Ballistics
aruw / controls
State estimation and targeting. Orientation and position and all that jazz.
Prioritized