Test Plan Reference: Can assign output to step setting loaded from test plan
Environment:
Windows 10, 64-bit
OpenTAP 9.10.
Steps to reproduce:
- Add a Dialog test step
- Save it in a test plan
- Load the test plan in a Test Plan Reference step
- Go to Dialog - > If Yes/OK Verdict and right-click
Actual result:
Can assign an output
Expected result:
Steps loaded in Test Plan Reference should be read only
Other remarks: